TL;DR
- Rate to charge = wage × (1 + burden) ÷ billable share ÷ (1 − overhead − profit).
- An electrician at the BLS median wage of $30.38 needs about $110 an hour, 3.6 times the wage.
- Labor burden built from IRS, Labor Department, Oregon, KFF and BLS figures: 30% of wages for an electrician, 39% for a roofer.
- The BLS employer cost survey puts the same items at 29.6% of wages across construction. Our build came to 29.9%.
- No agency publishes a billable share. Our 60% is 2,080 paid hours less 18 paid days off, times the 65% Field Promax measured.
- Skip adding 40% to cost. That prices the same hour at $92 and loses $1.32 on it.
A labor rate calculator answers one question: what to charge for an hour of a worker's time. For an electrician at the Bureau of Labor Statistics (BLS) median wage of $30.38, the answer is about $110 an hour, 3.6 times the wage, once burden, unbilled hours, overhead and a 10% profit are counted.
This guide is for owners of small trade and home service companies who bill by the hour or build flat prices from an hourly rate. Every figure was read at its source on November 16, 2026.
Labor rate calculator: from a wage to the rate you charge
Pick a trade, then set your own numbers in the calculator below. The note under each slider says where its default comes from.
At the defaults, an hour that pays the worker $30.38 costs you $65.82 by the time it is billed. Overhead and profit take that to $109.71, which we round to $110.
One worker at that rate bills 1,248 hours a year and brings in $136,913 of labor revenue. Net profit on it is $13,691.
We opened the calculators that rank for this search. Several start with empty boxes, and one built for auto repair shops multiplies the loaded wage by a flat 2.5.
Most of the ones we opened are a labor cost calculator: they stop at what the hour costs you. A billable rate calculator has to carry on through overhead and profit. The sections below give a published figure for every input along the way.
The labor rate formula multiplies once and divides twice
The whole method is one line. The rate equals the wage times one plus burden, divided by the billable share, divided by one minus overhead and profit.
- Wage. What the worker earns an hour, from your payroll.
- Labor burden. Employer-paid taxes, insurance and benefits on top of the wage, as a percent of it. Wage plus burden is the loaded cost.
- Billable share. The part of paid hours a customer pays for. Dividing by it spreads drive time, shop time and paid days off over the hours you bill.
- Overhead and net profit. Both are shares of the price, so you divide by what is left after them.
| Step | Math | Result |
|---|---|---|
| Wage | BLS median, electricians | $30.38 |
| Add 30% burden | $30.38 × 1.30 | $39.49 loaded cost |
| Divide by the 60% billable share | $39.49 ÷ 0.60 | $65.82 per billable hour |
| Divide by what overhead and profit leave | $65.82 ÷ (1 − 0.30 − 0.10) | $109.71 |
| Rate to charge | About $110 an hour, 3.6 times the wage | |
Two of the three steps divide. That is where hand-built rates slip, and the mistakes section further down puts dollars on each slip.
The wage: BLS medians run from $18.82 to $30.67 an hour
Start with what you pay. If you are pricing a hire you have not made yet, BLS publishes median pay by occupation. The figures below come from its Occupational Outlook Handbook and reflect the May 2025 wage survey.
| Occupation | Median hourly wage | Median annual wage |
|---|---|---|
| Plumbers, pipefitters and steamfitters | $30.67 | $63,800 |
| Electricians | $30.38 | $63,190 |
| HVAC mechanics and installers | $29.33 | $61,010 |
| Carpenters | $29.12 | $60,580 |
| Roofers | $26.65 | $55,440 |
| Painters, construction and maintenance | $23.75 | $49,400 |
| Landscaping and groundskeeping workers | $18.82 | Not printed |
A median is the middle worker, so half of each trade earns more. The spread inside one trade is wide. BLS puts the lowest-paid tenth of electricians under $42,640 a year and the highest-paid tenth over $108,510.
Use your own payroll in the calculator wherever you have it. The medians are for checking an offer, or for pricing a position before you fill it.
Labor burden calculator: what rides on top of the wage
Labor burden is every cost you pay because someone is on payroll, beyond the wage itself. The labor burden rate is those costs divided by wages. This section works as a labor burden calculator on paper: one line per item, each with a published figure.
Payroll taxes the IRS sets
The IRS sets the federal pieces, in Publication 15 for 2026 and its page on federal unemployment tax. The rates are the same for every trade.
- Social Security: 6.2% of wages, on pay up to $184,500 in 2026.
- Medicare: 1.45% of wages.
- Federal unemployment tax (FUTA): 6.0% on the first $7,000 of each worker's pay.
- The usual credit for paying state unemployment tax cuts FUTA to 0.6%, which is $42 a worker a year. Employers in a credit reduction state get a smaller credit.
Together the first two are 7.65% of every wage dollar. FUTA is small beside them: $42 is 0.07% of a median electrician's pay.
State unemployment tax depends on your state and your history
Each state sets its own rates and its own wage base, then assigns your rate from your claims history. The Labor Department's 2025 figures put the average employer's tax at 0.37% of total wages nationwide.
State averages ran from 0.07% of total wages in Alabama to 1.20% in Oregon. Those are averages across every employer in the state, so your own rate can sit well away from them.
Texas shows the range inside one state. The Texas Workforce Commission's 2026 rates run from 0.32% to 6.32% on the first $9,000 of each worker's pay.
That is between $28.80 and $568.80 a worker a year. Use the rate printed on your own state notice.
Workers' compensation is where the trades split
Workers' compensation insurance is priced per $100 of payroll, by job class. Oregon's Department of Consumer and Business Services (DCBS) compares the rates in every state in a study it repeats every two years.
Its 2024 edition lists a calculated manual rate for each job class in 51 jurisdictions. A manual rate is the listed rate for a class of work, before any adjustment for a single employer. We took the median across the 51 for the classes a contractor uses.
| Job class | Median rate per $100 of payroll | Lowest and highest |
|---|---|---|
| Electrical wiring | $2.37 | $0.98 to $5.96 |
| Plumbing | $2.70 | $0.96 to $7.68 |
| Heating, air conditioning and refrigeration | $3.60 | $1.68 to $6.76 |
| Carpentry, not otherwise classified | $4.58 | $1.95 to $17.93 |
| Cabinet and interior trim carpentry | $4.75 | $1.99 to $10.11 |
| Painting | $5.08 | $2.35 to $13.84 |
| Carpentry, homes up to three stories | $8.71 | $3.68 to $38.79 |
| Roofing | $9.64 | $1.18 to $28.84 |
| Spread | Roofing's median is four times electrical wiring's | |
The medians are our arithmetic on the study's Appendix 6, which uses rates in effect on January 1, 2024. West Virginia had the lowest rate in six of the eight classes, and New York the highest in five.
The study builds each rate from the state's class rate and an average insurer multiplier, so it is not what any one employer pays. Read the rate off your own policy. Landscaping is not among the study's 53 classes, which is why it is missing here.
At the median rates, workers' comp costs $2.57 for every hour a median-wage roofer is paid. For a median-wage electrician it is 72 cents.
Health insurance is a flat dollar cost, so it weighs more on lower wages
KFF's 2026 Employer Health Benefits Survey puts the average premium for single coverage at $9,804 a year. Workers paid $1,672 of it on average, which leaves the employer $8,132.
Spread over 2,080 paid hours, that is $3.91 an hour. BLS lands on almost the same number in its own survey: construction employers spent $3.90 per hour worked on insurance of all kinds in June 2026.
The dollars do not shrink with the wage. The employer share is 12.9% of a median electrician's pay and 20.8% of a median landscaping worker's.
KFF surveyed 1,937 employers with ten or more workers, and 67% of those firms offer coverage. Smaller shops are less likely to. BLS reports that 55% of workers at private establishments with fewer than 50 employees have access to a medical plan.
Retirement averages 6.6% of construction wages
For retirement, the broadest figure we found is the BLS employer cost survey. Construction employers spent $2.39 per hour worked on retirement and savings in June 2026, against $36.13 in wages. That is 6.6% of wages.
Access is thinner at small firms. At private establishments with fewer than 50 workers, 55% of workers have access to a retirement plan and 37% take part.
Paid time off: count it once
Paid holidays and vacation are a real cost, and there are two ways to count them. You can add them to burden as a percent of wages, or you can take the hours out of the billable share. Pick one, because doing both charges the customer twice.
This calculator pays the wage for all 2,080 hours and removes days off from the billable share. So the burden figures in this guide leave paid leave out.
An electrician's burden, line by line
| Item | Share of wages | A year, on $63,190 |
|---|---|---|
| Social Security and Medicare | 7.65% | $4,834 |
| Federal unemployment tax | 0.07% | $42 |
| State unemployment tax, US average | 0.37% | $234 |
| Workers' comp, median electrical rate | 2.37% | $1,498 |
| Health insurance, employer share | 12.87% | $8,132 |
| Retirement | 6.62% | $4,180 |
| Labor burden | 29.9% | $18,920 |
That is how to calculate labor burden for one worker: every employer-paid line for the year, divided by the year's wages.
The 29.9% is the calculator's 30% default. Take out retirement and it is 23.3%. Take out health insurance too and the required items alone come to 10.5%.
The BLS cross-check lands within a third of a point
BLS measures the same thing from employer records. In June 2026, construction employers paid $36.13 an hour in wages plus $10.71 across three groups: legally required benefits, insurance and retirement.
That is 29.6% of wages. Our line-by-line build came to 29.9%.
Retirement is the BLS figure in both, so the independent test is on the rest. Taxes, workers' comp and health insurance total 23.3% in our build and 23.0% in the BLS survey.
Two caveats keep this honest. The parts differ even though the totals agree. BLS shows required costs at 12.2% of wages against our 10.5%, and insurance at 10.8% against our 12.9%.
The BLS average covers every construction class, roofing and framing included, and it spreads the same insurance dollars over a higher average wage. The match is also for an electrician only. Riskier classes run higher.
BLS also counts paid leave and supplemental pay, such as overtime premiums and bonuses. With those in, benefits reach 43.8% of construction wages. If a burden figure you were handed is above 40%, check whether paid leave is inside it.
The Small Business Administration (SBA) offers a looser test. A 2019 post on its blog gives a rule of thumb that an employee costs 1.25 to 1.4 times salary. Our electrician sits at 1.30.
Burden climbs with workers' comp and falls with the wage
Run the same build for each trade and the burden rate moves with two things: the workers' comp class and the size of the wage the flat health premium is divided by. The chart uses the median figures above.
A roofer at the median wage earns $3.73 an hour less than an electrician. After burden the gap is $2.43, because workers' comp and the flat health premium take a bigger share of the roofer's pay.
Before you trust any rate, check that each of these costs is inside it. Tick what your current rate already counts in the scorecard below.
Billable share: no agency publishes one, so count the hours
Billable share is billed hours divided by paid hours. No government survey measures it for the trades, which makes it the input most worth pulling from your own records. Here is how the calculator's 60% default was built.
| Line | Hours | Where it comes from |
|---|---|---|
| Paid hours, 52 weeks of 40 | 2,080 | A full-time year |
| Paid holidays, 8 days | −64 | BLS average for private industry, 2025 |
| Paid vacation, 10 days | −80 | BLS: 32% get 10 to 14 days after a year |
| Hours at work | 1,936 | Subtraction |
| Share of those hours billed | 5.7 of 8.8 | Field Promax, 300 HVAC companies |
| Billable hours | 1,254 | 60% of the 2,080 paid hours |
The billed share comes from a Field Promax report that ACHR News covered in June 2026. Across 300 HVAC companies, techs billed 5.7 hours of an 8.8-hour paid day.
That is about 65% of paid time. Drive time that no trip charge recovered took 1.13 hours of the day. Paperwork, idle gaps, training and work not on a work order took about two more.
That is the only measured figure we found, and it covers one trade. ServiceTitan's guide calls 65% to 75% average and names no sample.
The Air Conditioning Contractors of America (ACCA), a trade association, puts the yearly ceiling near 91% once holidays, vacations, training and drive time come out. So the published range is wide, and your own timesheets beat all of it.
| Billable share | Cost of a billable hour | Rate to charge |
|---|---|---|
| 91%, ACCA's ceiling | $43.40 | $72 |
| 75% | $52.66 | $88 |
| 65% | $60.76 | $101 |
| 60%, the calculator default | $65.82 | $110 |
| 50% | $78.99 | $132 |
Near the default, every five points of billable share is worth about $8 to $10 an hour for this electrician. To find your own share, add up four weeks of invoiced hours and divide by the paid hours on the same timesheets.
Rate set, but not enough hours to bill?
A rate only pays on the hours you sell. Skill Mammoth builds websites and runs marketing for contractors and home service businesses.
Overhead and net profit set the last divisor
Overhead is every cost not tied to one job. The SBA's break-even guide calls these fixed costs and lists rent, salaries, insurance and depreciation among its examples.
To find yours, total twelve months of those costs from the profit and loss statement (P&L) and divide by revenue for the same months. Published benchmarks are thin, and they do not agree.
- Remodelers: operating expenses of 23.6% of revenue in fiscal 2024, from the 2026 Remodelers' Cost of Doing Business Study by the National Association of Home Builders (NAHB).
- Residential HVAC service and replacement: 30% to 45% of revenue, from a ServiceTitan guide that names no sample.
- HVAC, counted per billable hour: typically $40 to $50, from an October 2025 post on ACCA's blog.
The calculator's 30% default is the low end of the service range and sits above the remodeler figure. At the default rate it works out to $32.91 an hour, under ACCA's range. A service shop with trucks and dispatch should expect to move that slider up.
Net profit is what remains after direct cost and overhead, with the owner's pay counted inside overhead. NAHB's remodelers averaged a 6.3% net margin for fiscal 2024.
The 2025 Contractor of the Future Study, from ACCA and Farmington Consulting Group, found a 6% average across more than 1,000 HVAC contractors. It called 10% the line for sustainable growth, which is the calculator's default.
The full study goes to ACCA members, so those figures come from coverage in Contracting Business. Our guide to contractor profit margins sets the published gross and net bands side by side, trade by trade.
| Overhead share of revenue | Divisor at 10% profit | Electrician's rate |
|---|---|---|
| 25% | 0.65 | $101 |
| 30% | 0.60 | $110 |
| 35% | 0.55 | $120 |
| 40% | 0.50 | $132 |
| Every five points of overhead | Adds $8 to $12 an hour | |
How to calculate labor cost and the rate for three trades
Here is how to calculate labor cost for three workers at the BLS median wage, each with the burden rate from the chart. Billable share, overhead and profit stay at the defaults, so only the trade changes.
| Line | Electrician | HVAC technician | Roofer |
|---|---|---|---|
| Hourly wage | $30.38 | $29.33 | $26.65 |
| Labor burden | 30% | 32% | 39% |
| Loaded cost an hour | $39.49 | $38.72 | $37.04 |
| Cost of a billable hour, at 60% | $65.82 | $64.53 | $61.74 |
| Rate to charge | $110 | $108 | $103 |
| Rate as a multiple of the wage | 3.6 | 3.7 | 3.9 |
The roofer is paid 12% less than the electrician and has to be billed only 6% less. Burden closes half the gap. A shop that prices roofing labor off the wage alone gives that half away.
The HVAC column is a check on our own work. Our guide on how to price HVAC jobs reached $66 per billable hour by a different route, with paid leave counted as a cost and a 65% billable share. This method gives $64.53.
There is a rough outside check as well. At the default, the wage is 28% of the rate.
Census Bureau counts for 2022 put payroll at 30.5% of receipts for electrical contractors with $1 million to $2.5 million in revenue. Receipts include materials and payroll includes the office, so the comparison is loose. Our HVAC KPIs guide runs the same Census table by company size.
A one-person shop runs the same math with one change: your own pay is the wage. Our handyman hourly rate guide covers that case.
Five mistakes that put the rate in the wrong place
Each of these shows up in rates worked out on the back of an invoice. The dollars use the electrician example.
- Billing the loaded cost. $39.49 covers the worker for an hour on the clock. It is $26.33 short of what a billed hour costs you, before any overhead.
- Multiplying where the formula divides. Adding 40% to the $65.82 cost gives $92.15. Overhead at 30% of that price is $27.65, which leaves a loss of $1.32 an hour. Our markup vs margin guide has the conversion table.
- Forgetting unbilled time. Skip the billable share and the formula returns $65.82. That is exactly what the hour costs you, with nothing left for overhead or profit.
- Counting paid time off twice. Eighteen paid days are 6.9% of the year. Add that to burden and also remove the hours, and the rate comes out near $116, about 5% above what your costs call for.
- One rate for every skill level. At the default settings, the wage at the bottom tenth of electricians calls for about $74 an hour and the wage at the top tenth about $188. Set a rate per pay grade, or price by the crew you send.
From the labor rate calculator to flat-rate prices
A flat-rate price gives the customer one number for a defined job before work starts. The hourly rate still sits inside every flat price you quote.
The reason to bother shows up in survey data. In the ACCA study, contractors using flat rate pricing averaged a 7% net profit, against 4% for those using other methods.
To build a flat price, multiply the task's hours by the cost of a billable hour, add materials at your cost, then divide by the same divisor. Set your own job in the calculator below. Its labor cost default is the $65.82 from the first calculator, rounded to $66.
At the defaults, a two-hour job with $120 of materials has $252 of direct cost and prices at $420. Net profit on it is $42.
- List the work. ServiceTitan's flat-rate guide says to start with your top 20 to 50 tasks and build those in full before adding more.
- Time each task. Use your own job records, and price for the average worker on the crew.
- Price each one. Hours times the cost of a billable hour, plus materials, divided by one minus overhead and profit.
- Add tiers for hard conditions. The same guide names attic or crawlspace access, rooftop work and after-hours calls.
- Rerun the rate when an input moves. A raise, a new workers' comp rate or a health renewal each change the cost of a billable hour.
The rate also belongs in your plan. Our plumbing business plan guide puts a pricing method and a break-even point with owner pay into the sections a lender reads.
When the rate is right and the calendar has gaps
A correct rate fixes what each billed hour earns. It cannot add hours. In the billable share table, a worker who bills 50% of paid time needs $132 an hour, where one who bills 60% needs $110.
So one way to lower the rate you need is more booked work per day, and that is a marketing problem as much as a dispatch one. Put marketing in your overhead figure first, then judge it by what a booked job costs.
Skill Mammoth builds websites and runs marketing for contractors and home service businesses. Plans start at $350 a month, and a website build is $3,000 or $150 a month for 24 months. If your rate is right and the schedule has holes, that is the part we can help with.
Want more billable hours at the rate you just set?
We build the website and run the marketing that fills a contractor's schedule. Plans start at $350 a month.
Frequently asked questions
How do you calculate a labor rate?
Multiply the hourly wage by one plus your labor burden, divide by the share of paid hours you bill, then divide by one minus your overhead and profit shares. For an electrician at the BLS median wage of $30.38, with 30% burden, a 60% billable share, 30% overhead and 10% profit, that is $39.49, then $65.82, then about $110 an hour.
How do you calculate labor burden?
Add up every employer-paid cost on top of wages for a year and divide by the wages. Count Social Security and Medicare at 7.65%, federal and state unemployment tax, workers' compensation at your class rate, plus your share of health insurance and retirement. For a median-wage electrician those items total about $18,920 on $63,190 of wages, a labor burden rate of 29.9%.
What is a typical labor burden rate for a contractor?
Built from government and survey figures read on November 16, 2026, burden runs from about 30% of wages for a median-wage electrician or plumber to 39% for a roofer, with health insurance and retirement included. The Bureau of Labor Statistics puts the same items at 29.6% of wages across construction employers. A shop offering no health plan or retirement sits nearer 10% to 18%.
How many billable hours are in a year?
A full-time year is 2,080 paid hours. No agency publishes a billable share, so count your own. In our example, 8 paid holidays and 10 vacation days leave 1,936 hours at work. Field Promax found HVAC techs bill 65% of paid time, which gives about 1,254 billable hours, or 60% of the year. ACCA puts the realistic ceiling near 91%.
What is the difference between labor cost and a billable rate?
Labor cost is what an hour of a worker costs you. The billable rate, or labor rate, is what you charge for it. A median-wage electrician costs $39.49 an hour with burden, and $65.82 per billable hour once unbilled time is spread over the hours you bill. The rate adds overhead and profit, about $110 at 30% overhead and 10% profit.
Should every worker be billed at the same hourly rate?
No. BLS data puts the lowest-paid tenth of electricians under $42,640 a year and the highest-paid tenth over $108,510. At the calculator's default settings those wages call for about $74 and $188 an hour. One blended rate overprices simple work and gives away your best tech's hours. Set a rate per pay grade, or price by the crew you send.
ChatGPT