TL;DR
- A landscape installation contract needs 12 sections, from the scope and plant list to the right to cancel and a lien notice.
- The editable Word document and print-ready PDF are free. The sample signs a Richfield, Minnesota patio and planting bed at $6,045.09.
- Collect 10% at signing and 40% when the pavers arrive: $3,022.55 in hand before the crew lays a paver.
- In Minnesota, a contract without the pre-lien notice in section 514.011 gives up your lien right.
- Tie the one-year plant warranty to a written watering schedule, or the July losses are yours.
- Skip the 40% deposit. On this job it is four times what California allows a contractor to take up front.
A landscaping contract template for installation work needs 12 sections, and the four that protect the margin are the payment schedule, the plant warranty, the right to cancel and your state's lien notice. Our sample carries the $6,045.09 patio and planting bed from our estimate template through every clause.
This guide is for the owner of a one-to-fifteen-person landscape company, and whoever runs the office, who signs patios, plantings, grading and walls. Every statute and wage below was read at its source on November 25, 2026.
Download this landscaping contract template. The editable Word document and a print-ready PDF are free in the contractor templates pack, alongside the other trades.
The landscaping contract template, clause by clause
The download has twelve numbered sections. Each one below has the reason it is there and wording to start from. The sample is Birchline Landscape & Hardscape, a company we made up. It signs a back yard in Richfield, just south of Minneapolis, on Monday, March 22, 2027.
This is a starting point and not legal advice. State rules on lien notices, cancellation and contractor registration vary, so have an attorney adapt the contract to your state before you use it.
1. Scope of work and plan reference
Write the work so a stranger could check it with a tape. The sample gives the patio size, base depth, bed area and sod repair, then names the estimate and site plan by number and date. An undated plan invites the "old drawing" argument.
Minnesota's Attorney General says state law requires a detailed summary of the services, a description of the specific materials and the total price. Then write what is out. The sample excludes irrigation, lighting and the front bed the customer declined.
The Contractor will install a 12 x 16 ft (192 sq ft) paver patio on 6 in of compacted Class 5 base and 1 in of bedding sand. The work follows estimate [number] and site plan [number], both dated [date]. If the plan and this agreement disagree, this agreement controls.
2. Materials and plant list with sizes
List every product by name, size and count. The #1 and #5 on the sample are nursery container classes, often called one-gallon and five-gallon pots. A contract that says "shrubs" lets a cheaper plant show up on install day.
California's license board tells homeowners to get a contract that names the variety and quantity of plants, their placement and the soil amendments. Wisconsin's home improvement rule ATCP 110.05 requires the main products by make and model, or by size, grade or quantity.
Say where the extras go. Two full pallets of 120 square feet for a 192 square foot patio leave 48 square feet of spares, and the sample says they stay with the customer for repairs.
3. Site conditions and utility locates
Minnesota statute 216D.04 requires an excavator to notify Gopher State One Call at least 48 hours before digging, not counting the day of notice, weekends and holidays. A ticket stays valid for 14 calendar days, so the start date and the locate have to line up.
Gopher State One Call lists the private lines it does not mark, including these:
- Irrigation and sprinkler systems
- Invisible fences
- Low-voltage landscape lighting
- Drain tile
So the sample makes the customer mark or disclose private lines before the start date. You repair what you were told about, and the customer pays for what was hidden. Buried concrete and rock found in the dig go to a change order.
4. Grading, drainage and cleanup
Say which way the water goes and where the dirt goes. The sample pitches the patio away from the house and spreads about 5.5 cubic yards of excavated soil into a low spot by the back fence, so there is no haul-off to price or argue about.
California's board tells homeowners to look for a cleanup and debris clause. The sample has the crew sweep hard surfaces daily.
5. Schedule and weather
Give a start week and the working days, then say what moves them. The sample starts the week of May 3, 2027 and needs about four working days on site.
Rain, frozen ground and supplier delays extend the schedule day for day, at no charge to either side. The crew also waits for the cancellation period to end and for a valid locate ticket.
6. Price and payment schedule
Print the total, the tax line and every payment with its trigger. The sample collects 10% at signing, 40% when the pavers and base are delivered and 50% at the final walkthrough. The section on deposits below works the cash math.
The tax line follows your state. The Minnesota Department of Revenue says a landscape construction contract is not taxable and the contractor pays tax on the materials it buys, so the sample adds none.
7. Change orders
Anything added after signing is written up, priced and signed before the crew does it. The Minnesota Attorney General's handbook says a contract cannot be changed without both parties' written consent. Our change order template has a form to copy.
Put the pricing rule in the contract so each change order is simple arithmetic. The sample prices added labor at the $50.75 sell rate per crew hour and added materials at the estimate's unit prices.
Any change to the scope, materials or price will be written as a numbered change order with its price and any schedule change, and signed by both parties before the work is done.
8. Plant warranty and the watering duties that void it
Most plant claims start with water, so name who waters and how often. University of Minnesota Extension says to water new trees and shrubs on this schedule:
- Weeks 1 and 2: daily
- Weeks 3 to 12: every two to three days
- After week 12: weekly until the roots establish
- Each watering: a quarter to a third of the shrub's container volume
Extension adds that shrubs in Minnesota take at least two growing seasons to establish, and that rain only replaces a watering after more than an inch in a day. The sample's warranty replaces a dead plant once within a year, but only if the customer followed that schedule.
Animal, salt and storm damage are excluded. Housecall Pro's contract guide uses a 30-day plant guarantee in its example. Pick your own term, but tie it to the schedule.
9. Permits, HOA approval and your license
Assign each approval to one party. In the sample the customer brings any association approval and the contractor checks with the city before ordering, with any permit fee added at cost by change order.
Print your license or registration line too. Minnesota statute 326B.802 lists eight special skills. Two of them name work landscapers do: excavation includes grading, and masonry and concrete includes slabs, walls and drain systems.
The Department of Labor and Industry requires a residential building contractor or remodeler license for work in more than one special skill. Its contractor registration program covers companies that provide one. Ask the department where a patio with grading falls.
10. Mechanic's lien notice
A mechanic's lien is a claim against the property for unpaid work or materials. Minnesota statute 514.01 extends it to grading, soil and sod, and to furnishing and planting trees, shrubs and plant materials, so landscape installs qualify.
The catch is the notice. Section 514.011 requires a contractor who uses subcontractors or material suppliers to put a set notice in the written contract, in at least 10-point bold type. A contractor who leaves it out "shall not have the lien and remedy provided by this chapter."
The sample prints the statute's text in capitals under an "attorney review required" flag. Other states write their own. Florida's section 713.015 requires its notice on residential contracts over $2,500, on the front page or a separate page, in 12-point capitalized bold type.
11. Dispute resolution
Give a complaint a path before it reaches a lawyer. The sample asks for written notice, allows 10 business days to respond and fix the work, then requires mediation before a lawsuit in Hennepin County, where the job sits. These are our choices, not a statute, so set your own with your attorney.
12. The right to cancel, just above the signatures
A contract signed at the customer's kitchen table can carry a three-day right to cancel. The Federal Trade Commission's cooling-off rule covers sales at the buyer's home, invited or not, until midnight of the third business day.
Under that rule the seller gives the buyer two copies of a cancellation form and refunds within 10 days of a cancellation. Sales under $25 made at home are not covered.
Minnesota's home solicitation law, sections 325G.06 to 325G.11, gives the same three business days. A customer who called you for the visit stays covered unless they hand you a signed waiver in their own handwriting.
Minnesota also sets the wording. This sentence must sit near the buyer's signature in at least 10-point bold type, with a Notice of Cancellation form attached in duplicate. So the sample puts it last:
"You, the buyer, may cancel this purchase at any time prior to midnight of the third business day after the date of this purchase. See attached notice of cancellation form for an explanation of this right."
The sample signs on a Monday, so the right runs to midnight Thursday, March 25, 2027. Order nothing special and send no crew before then. The template prints the notice in capitals, so set it in bold with your attorney.
Installation contract or maintenance agreement: which one the job needs
An installation contract sells one finished job, and a maintenance agreement sells a season of visits. Keep them on separate paper.
| Term | Installation contract | Maintenance agreement |
|---|---|---|
| What it sells | One patio, bed, wall or grade | A season of visits |
| Price | One total from crew hours and materials | Per visit or per month |
| Payment | Deposit, progress payment, final | Monthly or after each visit |
| Warranty | Plants and hardscape, tied to watering | Damage reported within a set window |
| Lien notice | Yes, where your state requires it | Rarely the issue |
| Minnesota sales tax | Install contract not taxable, lawn services taxable | |
Minnesota's revenue department says lawn services are taxable even inside a maintenance contract, while the install contract is not. Our lawn care contract template covers the recurring agreement and snow.
Deposits and progress payments that stay ahead of the material bill
The payment schedule decides who is carrying the job. Here is the sample, on the $6,045.09 price from our landscaping estimate template:
| Payment | When due | Share | Amount |
|---|---|---|---|
| Deposit | At signing | 10% | $604.51 |
| Progress payment | Pavers and base delivered | 40% | $2,418.04 |
| Final payment | Final walkthrough | 50% | $3,022.54 |
| Total | 100% | $6,045.09 |
By the time the pavers sit in the driveway, the customer has paid $3,022.55. The whole material and delivery bill behind the estimate is $2,588.19. So the progress payment pays the supplier before your line of credit has to.
The deposit stays small on purpose. Minnesota's Attorney General calls a token good-faith down payment customary and tells homeowners to avoid contractors who insist on a large one.
California sets a number. Its license board says a down payment should never exceed 10% of the price or $1,000, whichever is less. On this job that cap is $604.51, the same as the sample's deposit.
Now try the split Housecall Pro's guide uses in its example: 40% at signing, 40% halfway and 20% at completion. On the sample that deposit is $2,418.04, four times the California cap and well past Minnesota's "small percentage".
The 20% final also hands the customer the upper hand on the last $1,209.02. A 50% final payment keeps the walkthrough honest on both sides, because you are still owed the larger share when the punch list gets written.
Check the contract price before you sign it
A payment schedule only protects a price that covers your costs. The sample prices each line at cost divided by 0.67, the share left after 25% overhead and an 8% net profit. The crew hour behind it starts from these Bureau of Labor Statistics (BLS) medians for May 2025:
- Landscaping and groundskeeping workers, Minneapolis-St. Paul: $22.67 an hour
- First-line supervisors of landscaping crews, same metro: $31.25
- The same workers nationally: $18.82
- The same supervisors nationally: $28.09
One supervisor and two workers average $25.53 an hour at the metro medians. BLS employer cost data for June 2026 adds $6.82 of benefits and taxes to every $21.06 of wages, for service occupations in professional and business services.
That ratio, 1.324, turns the $25.53 average into a $34 loaded crew hour, meaning wage plus benefits and taxes.
Landscape Management reported in February 2026 that the 150 companies in a peer benchmark averaged a 7.9% operating margin. The sample targets 8%. Set your own numbers in the calculator below. The defaults are the sample contract.
At the defaults the calculator prices the job at $6,045. The template rounds each line rate to the cent, which puts the contract three cents higher, at $6,045.09.
Adding 33% to the $4,050.19 cost as a markup quotes $5,386.75 and loses $10.13 after overhead. Our markup vs margin guide has the conversion table.
Contracts ready, but not enough site visits?
Skill Mammoth builds websites and runs marketing for contractors and home service businesses, so more homeowners ask you for the estimate.
What Minnesota, California, Florida and Wisconsin print
The clauses that change by state are the cancellation notice, the deposit, the lien notice and the license line. Here is what four states print, read today.
| State | Rule | Source |
|---|---|---|
| Minnesota | Contracts and change orders in writing | Attorney General handbook |
| Minnesota | Three business days to cancel a home sale | Statutes 325G.07 and 325G.08 |
| Minnesota | Pre-lien notice in the contract, 10-point bold | Statute 514.011 |
| California | Written contract over $500 | License board contracts page |
| California | Down payment: 10% or $1,000, whichever is less | License board |
| California | License for landscape jobs of $1,000 or more | License board landscaping fact sheet |
| Florida | Lien notice on home contracts over $2,500 | Statute 713.015 |
| Wisconsin | Written contract when payment comes before completion | ATCP 110.05 |
California prints two thresholds. Its contracts page requires a written contract over $500, while its January 2025 landscaping fact sheet requires a license for jobs of $1,000 or more. The sheet lists patios, walkways and retaining walls among the projects that need one, along with plants and sod.
Florida and Minnesota both set the lien notice's type size in the statute, so check yours before you print.
When owners search for a landscaping contract template, and when homeowners hire
Owners go looking for paperwork a month before homeowners go looking for landscapers. We pulled twelve months of US Google search data the day this guide was written, November 2025 through October 2026.
"Landscaping contract template" peaked in March at 1,600 searches, four times its September low. Three homeowner hiring searches, from "landscapers near me" to "paver installers near me", peaked a month later, in April, at 227,400.
51% of the year's template searches fell in February through May. January through March held 34% of the template searches but only 23% of the hiring searches. We summed each group's monthly counts and divided by its year total.
Open the month view in the explorer below to see each search's peak.
"Hardscaping near me" left the tool. It jumped to 27,100 in October, nearly double its next-highest month, so we kept it out of the hiring totals. Finish your contract in February, while the template searches are still climbing and the phone is quiet.
Seven mistakes that cost landscapers money on a signed contract
- No lien notice. In Minnesota the contractor who skips it loses the lien right on that job.
- A deposit past your state's limit. A 40% deposit on the sample is $2,418.04, four times California's cap.
- Work started inside the cancellation window. A customer who cancels on day three is owed a refund, and the dirt you moved is yours.
- "Shrubs" instead of a plant list. A cheaper bid looks the same as yours, and substitutions start arguments.
- A plant warranty with no watering schedule. The hydrangea that dries out in July becomes your replacement cost.
- Private lines nobody marked. The locate skips sprinklers, so the contract decides who pays.
- Changes agreed on the driveway. Unsigned extras are the ones that go unpaid.
Score a draft before you send it. The scorecard names the three heaviest gaps.
Where marketing fits once the paperwork is solid
A contract protects jobs you already won. Winning them starts on a website that asks for the estimate. Software can carry the contract once the volume grows: our landscaping estimating software guide compares the tools.
Liberty runs lawn care and snow removal rather than installs, but the move works for any landscape site. Put the quote form on the first screen so a homeowner on a phone can ask without scrolling.
Skill Mammoth builds websites and runs marketing for contractors and home service businesses. Plans start at $350 a month, and a website build is $3,000 or $150 a month for 24 months. Our guide to how to grow a landscaping business covers the rest of the plan.
The landscaping contract template from this guide, in Word and PDF with the sample filled in, is free in the contractor templates pack.
Want more patios to write contracts for?
We build the website and run the marketing that fills a landscaping calendar. Plans start at $350 a month.
Frequently asked questions
What should a landscaping contract include?
Twelve sections for installation work: scope with a dated plan, a materials and plant list with sizes, site conditions and utility locates, grading and cleanup, schedule and weather, price and payment schedule, change orders, the plant warranty and watering, permits and HOA approval, your state's lien notice, dispute resolution and the right to cancel. Our free template has all twelve with a sample filled in.
How much deposit should a landscaper ask for?
Check your state first. California caps a down payment at 10% of the price or $1,000, whichever is less, and Minnesota's Attorney General calls a small good-faith deposit customary. Our sample asks 10% at signing, 40% when pavers and base are delivered and 50% at the walkthrough, which collects $3,022.55 before the crew lays a paver on the $6,045.09 job.
Do landscapers need to give a mechanic's lien notice?
In Minnesota, yes, if you use subcontractors or material suppliers. Section 514.011 requires the notice in the written contract in at least 10-point bold type, and a contractor who leaves it out loses the lien. Florida requires its own notice on home contracts over $2,500. Other states differ, so have an attorney check the wording for yours.
Can a customer cancel a landscaping contract?
Often, within three business days, when the contract was signed at the customer's home. The FTC cooling-off rule covers home sales of $25 or more, and Minnesota's home solicitation law adds required wording near the signature and a cancellation form in duplicate. Hold the crew and any special-order materials until the period ends, and check your own state's rule.
What is the difference between a landscape contract and a maintenance agreement?
An installation contract sells one finished job, priced from crew hours and materials and paid by deposit, progress payment and final. A maintenance agreement sells a season of visits, billed per visit or per month. In Minnesota the install contract carries no sales tax while lawn services are taxable, even inside a maintenance contract, per the Department of Revenue.
Should a landscaping contract include a plant warranty?
Yes, but tie it to watering. University of Minnesota Extension says to water new shrubs daily for two weeks, every two to three days through week 12, then weekly until the roots establish. Our sample replaces a dead plant once within a year if the customer followed that schedule, and excludes animal, salt and storm damage.