TL;DR
- A landscaping estimate that wins the job measures the site, lists every plant by size and says who waters. The free template we checked has no measurements, plant warranty or watering line.
- The Excel workbook and print-ready PDF are free. The sample inside prices a Richfield, Minnesota patio and planting bed at $6,045.09.
- Price every line at cost divided by 0.67: 25% overhead plus an 8% profit, which is a 49% markup on cost.
- A Minneapolis crew hour costs about $34 loaded, built from BLS wages and employer costs. It sells for $50.75.
- Homeowner cost searches put 47% of their year into March through May. Have the template priced by February.
- Skip the one-line price: 68% of homeowners in a Housecall Pro survey get other quotes when a price runs high.
A landscaping estimate template that wins the job and protects the margin measures the site, lists materials by the ton, yard and plant, and prices every line at cost divided by what is left after overhead and profit. Our sample job, a 192 square foot paver patio with a planting bed, comes to $6,045.09.
This guide is for the owner or office manager who writes install estimates at a small landscaping company. Every wage, price and rule below was read at its source on November 20, 2026. The three tools take your own numbers.
Download this landscaping estimate template. The editable Excel workbook with the totals wired up, a field guide tab, and a print-ready PDF are free in the contractor templates pack, alongside the other trades.
What goes in a landscaping estimate template, section by section
The estimate has twelve sections, top to bottom. Jobber's free template, one of the pages that rank for this search, has fields for exclusions and a validity period but no site measurements, plant warranty or watering line.
| Section | What it holds | Why it matters |
|---|---|---|
| 1. Identity and validity | Name, license, insurer, number, date, 30-day hold | Supplier prices change without notice |
| 2. Customer and project address | Billing, project, how the crew gets in | Gate width sets the equipment |
| 3. Site measurements | Patio, bed and turf area, edging length | The customer can check them with a tape |
| 4. Hardscape materials | Base and sand by the ton, pavers by pallet | Depth and product explain the price |
| 5. Plant list | Name, container size, count | Ends the cheaper-plant argument |
| 6. Grading, drainage, utilities, access | Water flow, spoil, utility locate, access limits | The surprises that eat margin |
| 7. Labor | Crew hours at one sell rate | Hours are where estimates go wrong |
| 8. Materials and delivery | Cost divided by the same number | Every line carries overhead and profit |
| 9. Options | Priced lines to accept or decline | Turns whether into which |
| 10. Sales tax | Your state's rule for install work | Minnesota taxes maintenance, not install contracts |
| 11. Payment, warranty, watering | Deposit, progress payment, plant warranty, who waters | Most plant claims start here |
| 12. Change orders and signature | Additions priced in writing, then the signature | Ends the "I thought that was included" talk |
Walk the landscaping estimate template top to bottom
Here is each section with the sample filled in: Birchline Landscape & Hardscape, a company we made up, quoting a back yard in Richfield, just south of Minneapolis.
Identity and validity
Print your license number if your state or city issues one. Minnesota's statute 326B.805 requires a residential building contractor license for work in more than one special skill and exempts one-skill specialty contractors, so ask the Department of Labor and Industry where your work falls.
The validity line protects the number. The garden center catalog behind our paver and plant prices says its prices change without notice, so the sample holds for 30 days.
Customer and project address
Write both addresses when they differ, then how the crew gets in. "Access by 42 in side gate" rules out a skid steer and adds crew hours to every task that moves soil.
Site measurements
Write the dimensions, then the area. "Patio 12 x 16 ft = 192 sq ft" lets the customer check you with a tape. The sample measures four things:
- Patio: 192 square feet
- Planting bed: 150 square feet, with 30 linear feet of bed edge
- Sod repair around the patio: 100 square feet
- Paver edge restraint: 40 linear feet, since the house side needs none
Hardscape materials by the ton, yard and pallet
Base and sand sell by the ton, mulch and soil by the cubic yard. Rock Hard Landscape Supply's Twin Cities price list prints the coverage: a ton of rock covers 33 square feet at 6 inches, a yard of mulch 108 square feet at 3 inches. Write quantity and depth, because depth is what a cheaper bid shaves.
- Class 5 base, the crushed gravel Minnesota yards sell: 6 inches compacted under a 13 x 17 foot footprint, 7 tons
- Bedding sand, 1 inch: 1 ton
- Polymeric sand, joint sand with a binder that sets when wet: 4 bags
- Mulch, 3 inches over 150 square feet: 1.5 cubic yards
Watch the pallet. Our paver price comes from a catalog that sells non-stocked Belgard colors in full pallets of 120 square feet. A 192 square foot patio buys 240, and the spares stay with the customer for repairs. Say so on the estimate.
Plant list with size and quantity
List every plant by name, container size and count. The #1 and #5 on the sample are the nursery trade's container classes, often called one-gallon and five-gallon pots. A list that says "shrubs" invites a cheaper plant at install time.
Substitutions need the customer's written OK. Wisconsin's home improvement rule, ATCP 110.023, bars a seller from swapping the products in a contract without the buyer's prior consent, in writing when a written contract is required.
Grading, drainage, utilities and access
Say which way the water goes and where the spoil goes. The sample pitches the patio away from the house and spreads about 5.5 cubic yards of excavated soil into a low spot by the back fence, so there is no haul-off line to price.
Then the utility locate. Minnesota statute 216D.04 requires excavators to notify Gopher State One Call at least 48 hours before digging, not counting the day of notice, weekends and holidays. A ticket stays valid for 14 calendar days.
Labor in crew hours
Write labor as crew hours, meaning hours of one worker on the job, all at one sell rate. The sample carries 43 crew hours:
- Patio, from excavation to joint sand: 24 crew hours
- Planting bed: 10
- Sod repair: 3
- Mobilization, meaning load, drive, unload and clean up: 6
Those hours are an example, since we found no published paver production rate that names the jobs behind it. The sample works out to 8 square feet per crew hour. Time your next three patios and use your own number.
Materials and delivery
Each material line is your cost divided by the same 0.67 the labor uses, which the pricing section below explains. Bulk delivery gets its own line. Rock Hard charges $145 for a quad-axle load and $110 for a single axle to Richfield, in its Zone 2.
Options
Put 1 in the qty of any option the customer accepts and leave the rest blank. A blank qty prints the price and keeps it out of the total. That is how the sample shows three options the customer declined.
Sales tax
The tax line follows your state. Minnesota's Department of Revenue says a landscape construction contract is not taxable and the contractor pays tax on the materials it uses. So the sample's rate is zero, and the tax you pay at the yard goes into material cost.
Payment, warranty and watering
The sample asks 10% at signing, 40% once the pavers and base are on site and the balance at the walkthrough. The Minnesota Attorney General's home building handbook favors a small deposit like that over a large down payment.
Then the line most templates leave off: who waters. University of Minnesota Extension says to water new shrubs daily for the first one to two weeks, every two to three days through week 12, then weekly until the roots establish. In Minnesota that takes at least two growing seasons.
Each watering is a quarter to a third of the shrub's container volume. Print the schedule, name the customer as the one who waters and tie the one-year plant warranty to it.
Change orders and the signature line
One sentence does it: anything added after signing is written up with a price before the crew starts. The Minnesota handbook describes the same clause, a contract that cannot change without both parties' written consent. A signature and date line closes the page.
The sample job: $6,045.09, line by line
Copy this table instead of downloading. Every rate is the cost divided by 0.67, rounded to the cent.
| Line | Qty | Rate | Amount |
|---|---|---|---|
| Patio labor, excavation to joint sand | 24 crew hr | $50.75 | $1,218.00 |
| Planting bed labor | 10 crew hr | $50.75 | $507.50 |
| Sod repair labor | 3 crew hr | $50.75 | $152.25 |
| Mobilization and cleanup | 6 crew hr | $50.75 | $304.50 |
| Belgard Holland 60 mm pavers, 120 sq ft pallet | 2 pallets | $1,019.10 | $2,038.20 |
| Class 5 base, 6 in compacted | 7 tons | $52.24 | $365.68 |
| Bedding sand, 1 in | 1 ton | $35.82 | $35.82 |
| Polymeric joint sand, 50 lb | 4 bags | $64.16 | $256.64 |
| Paver edge restraint and spikes | 40 lin ft | $2.99 | $119.60 |
| Smooth hydrangea, #5 container | 5 | $49.24 | $246.20 |
| Perennials, #1 container | 12 | $16.40 | $196.80 |
| Garden blend soil | 1 cu yd | $61.19 | $61.19 |
| Double ground hardwood mulch, 3 in | 1.5 cu yd | $40.30 | $60.45 |
| Poly bed edging with stakes, 20 ft kit | 2 kits | $29.33 | $58.66 |
| Kentucky bluegrass sod | 100 sq ft | $0.43 | $43.00 |
| Delivery, base and sand, quad axle | 1 load | $216.42 | $216.42 |
| Delivery, soil and mulch, single axle | 1 load | $164.18 | $164.18 |
| Subtotal | $6,045.09 | ||
| Sales tax (Minnesota install contract) | 0% | $0.00 | |
| Estimate total | $6,045.09 | ||
| Option: Dimensions 12 paver upgrade | Declined | $303.22 | |
| Option: phase two with this job | Declined | $937.18 | |
| Option: phase two next spring | Declined | $1,405.84 |
The costs behind those rates, before the sales tax you pay at the counter:
- Rock Hard's 2026 list: Class 5 $35 a ton, sand $24 a ton, mulch $27 a yard, garden blend $41 a yard, bed edging $19.65 a kit
- A Twin Cities garden center's 2025 catalog, pickup prices: Holland pavers $5.69 a square foot (Lawn Love prints $4 to $6), #5 hydrangea $32.99, #1 perennial $10.99
- The USDA's quarterly sod report: Kentucky bluegrass at a weighted 29.04 cents a square foot, Midwest trade price, July to September 2026
- An Illinois and Wisconsin supplier's listing: polymeric sand $42.99 a bag
- Edge restraint: a $2 a foot placeholder inside Lawn Love's $0.50 to $3.25 for plastic edging. Use your yard's price.
Price each line from a $34 crew hour
Every line on the sample is a cost divided by 0.67, the share of each sales dollar left after 25% overhead and an 8% net profit come out.
Dividing by that divisor is the same as a 49% markup on cost. Our markup vs margin guide has the conversion table for other splits.
The crew hour: BLS wages times employer costs
Start with the wage. These are Bureau of Labor Statistics (BLS) figures from the May 2025 wage survey, which we pulled from the bureau's data service today:
- Landscaping and groundskeeping workers, Minneapolis-St. Paul metro: $22.67 median an hour
- The same job nationally: $18.82 median, $20.33 mean
- First-line supervisors of landscaping crews, Minneapolis-St. Paul: $31.25 median
- The same supervisors nationally: $28.09 median
A crew of one leader and two workers averages $25.53 an hour at the Minneapolis medians. Metro wages sit well above the national ones, so price from your own metro's row.
BLS employer cost data for June 2026 adds 32.4 cents of benefits and required taxes per wage dollar for service occupations in professional and business services, the row closest to a crew. The industry row landscaping firms are filed under, administrative and waste services, adds 34 cents with office staff counted.
We used the occupation row: $25.53 times 1.324 is $33.80, a $34 loaded crew hour, meaning wage plus benefits and taxes. Drive and load time sit in the hours as a mobilization line, and rain days belong in overhead.
Overhead and profit set the divisor
Landscape Management published a peer benchmark of 150 landscape companies in February 2026. Their average operating profit margin was 7.9%, up from 6.9% the year before.
Lower performers averaged 3.4% and higher performers 13.9%. The sample targets 8%.
We found no overhead benchmark for landscape companies with a stated sample. Aspire's November 2025 labor cost guide uses 36% in a worked example, not as a benchmark. The sample uses 25%: replace it with twelve months of your overhead divided by revenue.
So labor sells at $34 divided by 0.67, or $50.75 a crew hour.
Lawn Love's paver guide tells homeowners that hourly installers charge $50 to $80, so the formula rate sits at the bottom of what your customer expects.
Set your own numbers in the calculator below. The default is the sample job, and each preset uses the material prices read today.
At the defaults the calculator prices the sample at $6,045. The template rounds each line rate to the cent, which puts its subtotal three cents higher, at $6,045.09.
Check the price against what homeowners read
Cost guides are written for homeowners, and your customer has read one. The sample's patio lines come to $4,250.36 for 192 square feet before mobilization, or $22.14 a square foot. Here is how that compares.
| Source and date | Written for | Paver patio, installed |
|---|---|---|
| Our sample, built from cost | Owners | $22.14 a sq ft |
| Lawn Love, Nov 3, 2026 | Homeowners | $8 to $24 a sq ft |
| Lawn Love, 200 sq ft patio | Homeowners | $1,600 to $4,800 |
| LawnStarter, Nov 3, 2026 | Homeowners | $10 to $24 a sq ft |
| LawnStarter, professional install | Homeowners | $20 to $27 a sq ft |
| Homewyse, May 2026 | Homeowners | $20.03 to $25.95 a sq ft |
| Thumbtack, Jun 8, 2026 | Homeowners | $1,425 to $6,387 a patio |
| Verdict | Inside every range, near the top of Lawn Love's | |
The cost-built price lands inside every published range, and the line items defend it: they show the 6 inches of base and the joint sand a bottom-of-range price would leave out.
Weigh the guides lightly. Lawn Love and LawnStarter cite no data source, and Thumbtack says only that its range uses data from pros on its platform.
Estimates priced, but not enough site visits?
Skill Mammoth builds websites and runs marketing for contractors and home service businesses, so more homeowners ask you for the estimate.
Phase one now or the whole design at once: price both
A full design-build quoted as one number asks for a yes to everything. Price each phase as its own line and the customer chooses which phase instead of whether.
Housecall Pro surveyed 1,100 homeowners in February 2026. 68% said they get other quotes when a price comes in higher than expected, and 62% are more likely to go ahead when financing is offered.
The sample prices three options, each with a blank qty:
- Phase two with this job, a 120 square foot front bed: $937.18
- The same phase two next spring as its own trip: $1,405.84
- Belgard Dimensions 12 pavers in place of Holland: $303.22 more
Phase two costs $468.66 more next spring because it needs its own mobilization and its own soil and mulch delivery. Print both prices and the customer sees what waiting costs.
The upgrade is cheap because the stocked Dimensions color sells by the layer, so the patio buys 204 square feet of it, while Holland rounds up to two full pallets.
Done all at once, both phases come to $6,982.27. Put that figure in the cover note so the full design has a number too.
Install estimates and maintenance quotes price differently
An install estimate prices one job from crew hours and materials. A maintenance quote prices a season of visits from minutes on site times your crew rate. Our guide to how much to charge for lawn mowing works that math against the published per-cut prices.
The tax line flips too. In Minnesota the patio contract carries no sales tax, while lawn and garden services are taxable even inside a maintenance contract, per the Department of Revenue page updated February 3, 2026.
Once a season is signed, the terms move to the lawn care contract template and the monthly bill to the lawn care invoice template.
Estimate, quote, bid or proposal: four words, four promises
- Estimate: your price for the work as measured, good for a stated time, with changes through change orders.
- Quote: a fixed price for a defined scope, common for maintenance and small jobs.
- Bid: a price submitted against someone else's plans, common on commercial work.
- Proposal: an estimate plus the design, the options and the sales case, the usual format for design-build.
The words blur in practice. Minnesota's Attorney General warns homeowners that "the bid or proposal is rarely detailed enough" to protect them in a dispute. Whatever you call yours, write it so the signed copy works as the contract.
Validity, deposits and change orders: what three states print
Deposit rules are state law, and these three states print theirs. Check your own state's consumer protection office before you print terms.
| State | Rule | Source |
|---|---|---|
| Minnesota | Small good-faith down payment, payments that track work | Attorney General handbook |
| Minnesota | Contracts and change orders in writing, materials described | Attorney General handbook |
| California | Down payment: 10% or $1,000, whichever is less | Contractors State License Board |
| California | Written contract over $500, three days to cancel | Contractors State License Board |
| Wisconsin | Written contract if any payment comes before completion | ATCP 110.05 |
| Wisconsin | Covers patios and landscaping by name | ATCP 110.01 |
California's board states its cap for home improvement contracts, and its page does not say whether landscaping counts, so ask the board if you work there. Minnesota's handbook tells homeowners to avoid contractors who insist on a large down payment, which the sample's schedule respects.
Validity is your call. Thirty days fits supplier lists that change without notice, and a change order covers what turns up after signing, such as buried concrete in the patio footprint.
Free estimates, design fees and trip charges
Give the site visit free for install work, and screen before you drive: ask for the project, a budget range and photos of the yard.
Charge for design. A drawn plan with a plant list is work a homeowner can hand to a cheaper crew, so price it as a design fee and credit it against the install if they sign within the validity period. A trip fee fits small return visits. Print both on the estimate.
Send it in the spring rush, then follow up twice
Homeowners price their projects in spring. We pulled twelve months of Google searches for twelve homeowner cost terms, from "sod installation cost" to "yard grading cost". 47% of the year's searches fell in March through May, and March ran 4.4 times December.
We summed the monthly counts for the twelve terms from November 2025 through October 2026, using Google Ads data through DataForSEO, then divided March to May by the year.
Owners search for templates on the same clock. "Landscaping estimate template" peaked in March and May at 720 searches a month. Build and price yours in February.
Pick a search in the explorer below and switch to the month view to see its peak.
We found no published figure on how fast landscaping estimates go out, so set your own rule: send within two business days of the site visit, while the measurements are fresh.
Jobber's May 2026 guide to quote follow-ups recommends three touches: one to two days after sending, again after a week, and once more 24 to 48 hours before the quote expires. Jobber's software sends up to two automatic follow-ups on its Connect plan and up.
After the third touch, close the file and add the customer to next season's list. The customer who said "not yet" in May is still in the market next March.
Build estimates in software once the template works
A spreadsheet is enough while one person writes every estimate. Past that, the same structure moves into software with a costbook of your unit prices.
Optional lines are the feature to check first. Jobber's help page, updated March 10, 2026, says the client ticks the optional items they want, the total updates and a percentage deposit recalculates. Declined items print greyed out as not included.
Our landscaping estimating software guide compares 31 tools with the price each vendor prints, from satellite lawn measurement to design-build costbooks.
Seven mistakes that lose the job or the margin
- One line for the whole job. "Install patio and bed, $6,000" gives the customer nothing to compare except the number.
- Area with no dimensions. A square footage the customer cannot check reads as a guess.
- Hours from memory. Labor is 36% of the sample's cost. Use your timesheets.
- Percentages added to cost. Adding 33% to the sample's $4,050.19 of cost quotes $5,386.75 and loses $10.13 after overhead.
- No plant list. "Shrubs" lets a cheaper bid look the same as yours.
- No watering line. The plant that dies in July becomes your replacement cost.
- Pavers priced by the foot when the yard sells by the pallet. The rounding comes out of your margin.
Score a draft before sending. The scorecard names the three heaviest gaps.
If the estimates are priced and the calendar still has gaps
Skill Mammoth builds websites and runs marketing for contractors and home service businesses. Plans start at $350 a month, and a website build is $3,000 or $150 a month for 24 months. Our part of this chain is more site visits to write estimates for.
The landscaping estimate template from this guide, with the Excel formulas and the field guide tab, is free in the contractor templates pack. Our guide to how to grow a landscaping business covers what comes after the estimate wins.
Want more estimate requests this spring?
We build the website and run the marketing that fills a landscaping calendar. Plans start at $350 a month.
Frequently asked questions
What should a landscaping estimate include?
Twelve sections: identity and validity, the customer and project address, site measurements, hardscape materials by the ton and pallet, a plant list with sizes and counts, grading, drainage, utilities and access, labor in crew hours, materials and delivery, priced options, sales tax, payment terms with the plant warranty and watering schedule, and a change order sentence above the signature line.
How do you price a landscaping estimate?
Add the loaded labor cost and the materials for the job, then divide by what is left after overhead and profit. At 25% overhead and an 8% net profit the divisor is 0.67, which is a 49% markup on cost. Our sample patio and planting bed costs $4,050.19 to build and prices at $6,045.09.
What labor rate should a landscaper charge?
Build it from your wages. In the Minneapolis area, BLS puts the median landscaping worker at $22.67 an hour and the crew supervisor at $31.25 for May 2025. A leader and two workers average $25.53, about $34 a crew hour with benefits and taxes. Divided by 0.67, that sells at $50.75 a crew hour.
How long should a landscaping estimate be valid?
Set a hold that matches how fast your material prices move. Our sample uses 30 days, because the supplier lists behind it say prices change without notice or vary by location. Print the validity date on the estimate, re-price anything older, and use a change order for conditions found after signing, such as buried concrete or a utility line in the dig.
How much deposit should a landscaper ask for?
Check your state first. Minnesota's Attorney General calls a small good-faith down payment customary and favors payments that track the work. California caps home improvement down payments at 10% of the price or $1,000, whichever is less. Our sample asks 10% at signing, 40% when pavers and base arrive and the balance at the walkthrough.
Should landscapers charge for estimates?
Give install site visits free, but screen the lead first: ask for the project, a budget range and photos. Charge a design fee for a drawn plan with a plant list, because a homeowner can hand that plan to a cheaper crew, and credit the fee against the install if they sign within the validity period. Use trip fees for small return visits.
ChatGPT