TL;DR
- A winning HVAC estimate has 12 sections. The equipment schedule with model numbers is the one that sells.
- Price every line at your cost divided by 0.55 (35% overhead, 10% profit). A $66 billable hour sells for $120.
- The sample 3-ton AC replacement in Minneapolis totals $11,478 with the two-stage option picked.
- Show three or more options as separate lines. In the ACCA study, four or more options closed 52% of jobs against 42%.
- The federal 25C credit stopped with 2025 installs, per the IRS. Take it off your 2026 estimates.
- The Excel workbook with live totals and the print-ready PDF are free.
An HVAC estimate template needs the load calculation, an equipment schedule with model numbers and ratings, each equipment option priced as its own line, the permit, the warranty and the terms. Priced at cost divided by 0.55, our sample 3-ton air conditioner replacement in Minneapolis comes to $11,478 with the two-stage option picked.
This guide is for the owner or office manager who writes replacement estimates at a one-truck to ten-truck shop. Every figure was read at its source on November 20, 2026. The calculators below take your own numbers.
Download this HVAC estimate template. The editable Excel workbook with the totals wired up, a field guide tab, and a print-ready PDF are free in the contractor templates pack, alongside the other trades.
What an HVAC estimate template holds, section by section
Each section answers a question the homeowner asks now or in a dispute later:
| Section | What goes in it |
|---|---|
| 1. Identity | Name, phone, license number, insurer, EPA 608 line |
| 2. Numbers and validity | Estimate number, date, valid for, proposed start |
| 3. Customer and service address | Both, plus square footage and year built |
| 4. Load calculation | Manual J result and the date it was run |
| 5. Existing system | What fails, what stays, how old |
| 6. Equipment schedule | Make, model, tonnage, ratings and refrigerant per option |
| 7. Ductwork and line set | What was inspected, replaced or reused |
| 8. Permit and incentives | Who pulls the permit, rebate and tax credit status |
| 9. Options and price | One line per option, shared installation lines |
| 10. Add-ons | Maintenance agreement, accept or decline |
| 11. Terms and warranty | Timeline, deposit, balance, warranty, exclusions |
| 12. Acceptance | Option picked, signature and date |
We opened the free templates ServiceTitan and Jobber rank with on November 20, 2026. Both cover the identity block, the line items and the terms. Neither covers the load calculation, permits or rebates. Neither explains how to price a line, and ServiceTitan's asks for your business email first.
The HVAC section is what separates your estimate from the rest
Minnesota's Attorney General warns homeowners that a bid is rarely detailed enough to protect them, and tells them to specify brands and model numbers. The estimate that already does that reads as the careful one.
Equipment schedule
Write one block per option with these fields:
- Make and model number of the outdoor unit and its coil or air handler. HVACDirect's listings say an R-32 condenser needs a compatible R-32 coil, so confirm the pairing with the manufacturer.
- Size: tonnage for cooling, or BTU input for a furnace.
- SEER2: the seasonal cooling efficiency rating. Higher costs less to run.
- HSPF2: the same idea for a heat pump's heating. AFUE: the share of a furnace's fuel that becomes heat.
- Stage: single-stage, two-stage or variable speed. This explains most of the price gap between options.
- Refrigerant: the sample units all use R-32.
Goodman's regional standards page lists the federal floor in the North:
- Split air conditioner: 13.4 SEER2.
- Split heat pump: 14.3 SEER2 and 7.5 HSPF2.
Print the rating the equipment page prints. HVACDirect lists the sample heat pump at 8.2 "HSPF", so the template says HSPF.
Name the refrigerant on every option. NAHB reported in May 2026 that the EPA's revised rule lets contractors install systems made before January 1, 2025 with refrigerants such as R-410A until supplies run out.
Load calculation
Manual J is the method from the Air Conditioning Contractors of America (ACCA) for working out how much heating and cooling a house needs, room by room. ACCA's page says a proper load calculation is required by national building codes and most state and local jurisdictions.
Put the result and the date on the estimate, as the sample does: a cooling load of 34,200 BTU an hour, so 3 tons. That line answers the competitor who quotes a bigger unit for the same house.
Ductwork and line set
Say what you inspected and what you will replace or reuse. A reused line set or an unsealed plenum is where a low quote saves money it charges back later as a change order.
Permit and inspection
Name who pulls the permit and say the price includes the inspection. California's licensing board tells homeowners the contract should say who obtains the building permits. Minneapolis lists Level 1 mechanical work with no burner at $84.20, plus a $1 state surcharge.
The schedule does not name an AC swap, so Level 1 is our assumption. Confirm it with your city.
Rebates and the federal tax credit
Check incentives the day you send the estimate. On November 20, 2026 they stood here:
- Federal 25C credit: the IRS page says it covers property placed in service from January 1, 2023 through 2025. A 2026 install does not qualify.
- Minnesota's state heat pump rebate: the Commerce Department says Save Energy Minnesota has not launched and gives no launch date.
- Utility rebates: read your customer's electric and gas utility pages and print the amount with the date you read it.
A tax credit line copied from an older template promises the customer money the IRS will not pay on a 2026 install. Delete it.
Warranty terms
Print the equipment warranty, the registration requirement and your labor warranty as separate lines. HVACDirect's listing for the sample single-stage unit covers parts 10 years with online registration and 5 years without. Say you register the equipment, because that sentence is worth five years of coverage.
How to price each line of an HVAC estimate
Every line uses one formula: direct cost divided by one minus overhead and profit. Both are shares of the price, so you divide by what is left after them. The markup vs margin guide has the conversion table.
- Labor hours. All techs together, from your own job records.
- Loaded labor cost. What one billable hour costs you, with taxes, benefits and unbilled time inside it.
- Materials at cost. Equipment, coil, line set, kit and permit fee, at what you pay.
- Overhead. Every cost not tied to one job, as a share of revenue.
- Net profit. What you keep, also as a share of revenue.
The labor rate: $66 of cost becomes $120
Start with the wage. The Bureau of Labor Statistics (BLS) puts the median HVAC mechanic and installer at $29.33 an hour in May 2025.
- Benefits and taxes: BLS employer costs for installation, maintenance and repair jobs show $49.01 of pay per $33.61 of wages in June 2026, a ratio of 1.458.
- Loaded hour: $29.33 times 1.458 is $42.77.
- Billable share: Field Promax measured 5.7 billable hours in an 8.8-hour paid day across 300 HVAC companies (ACHR News, June 2026), about 65%.
- Cost of a billable hour: $42.77 divided by 0.65 is about $66.
- Sell rate: $66 divided by 0.55 is $120.
Our guide on how to price HVAC jobs walks through each step and the published hourly rates beside it.
Materials go through the same divisor
Dividing a part's cost by 0.55 is an 82% markup on that part. The sample uses list prices from HVACDirect, an online supplier, read on November 20, 2026. Use your distributor invoice instead.
Overhead defaults to 35%. ServiceTitan's July 2026 guide prints 30% to 45% for residential service and replacement.
Profit defaults to 10%, the line the ACCA and Farmington Consulting Group study calls necessary for sustainable growth. The study's average was 6%.
The sample job, line by line
The arithmetic for the sample job, with Option 2 picked:
| Line | Your cost | Divided by 0.55 |
|---|---|---|
| Two-stage AC $3,648 plus coil $923 | $4,571.00 | $8,310.91 |
| Labor, 16 hours at $66 | $1,056.00 | $1,920.00 |
| Line set, 30 ft | $381.00 | $692.73 |
| Condenser installation kit | $219.90 | $399.82 |
| Permit, $84.20 plus $1 surcharge | $85.20 | $154.91 |
| Subtotal | $6,313.10 | $11,478.37 |
This sample prices the permit like every other cost, because pulling it and meeting the inspector takes office and field time. Many shops pass the fee through at cost instead, as our plumbing and electrical templates do. That would take $69.71 off this total.
Overhead takes $4,017 of that subtotal and net profit is $1,148. The labor hours are our assumption: a crew of two for one day. This Old House says most AC installs take a full day, 8 to 10 hours. No source we read gives a crew size.
Set your own job in the calculator below. The three buttons load the template's three options at the same hours.
At the defaults, Option 2 prices at $11,478, the same subtotal the template prints. The calculator carries the permit inside materials, just as the template runs it through the divisor.
Check the price against what homeowners read
Your customer has read a cost guide before you knock. Here are the three options beside what the guides and Housecall Pro's contractor data print.
| Source | What it prints | Range |
|---|---|---|
| Sample, Option 1, single-stage | Cost-built price | $9,171 |
| Sample, Option 2, two-stage | Cost-built price | $11,478 |
| Sample, Option 3, heat pump | Cost-built price | $13,617 |
| This Old House, 14.3 SEER2 | Average $8,432 | $5,470 to $14,966 |
| This Old House, 16.1 SEER2 | Average $10,772 | $6,895 to $19,051 |
| This Old House, dual fuel | Average $11,084 | $7,252 to $19,051 |
| Fixr, August 2025, 3-ton AC installed | Homeowner range | $5,000 to $9,150 |
| Housecall Pro, 4-ton split AC | Contractor invoices | $5,500 to $11,965 |
This Old House builds its figures from a 2026 homeowner survey, and Fixr writes for homeowners shopping for quotes. Housecall Pro's ranges come from 3,648,131 service entries in the year to September 2026.
All three options sit inside This Old House's ranges, and each lands above its average. Option 1 tops Fixr's 3-ton range by $21. Online list prices pushed through an 82% markup run high on equipment, which is the honest weak spot of a single divisor.
Two fixes keep the method. Price equipment from your distributor invoice, or mark equipment up less and small parts more, then check that a month of jobs still clears overhead and profit.
Estimates priced right, but too few to write?
An estimate only pays when there is a homeowner to hand it to. Skill Mammoth builds websites and runs marketing for contractors and home service businesses.
Good, better, best: price each option as its own line
Options are a close-rate lever you control on every replacement estimate. Two contractor surveys point the same way:
- The ACCA and Farmington Consulting Group study of more than 1,000 contractors, as PHC Pros reported it in March 2026: four or more options closed 52% of jobs, one to three options 42%. Only 10% offered four or more.
- ServiceTitan's 2025 Residential Services Report, run by Thrive Analytics across more than 1,000 contractors: 54% of thriving contractors show three options on at least half their jobs. Struggling contractors do it on fewer than 10%.
Both are surveys, so they show a pattern without proving the options caused it.
The sample ladders by stage. Option 1 is a single-stage air conditioner and Option 2 a two-stage one. Option 3 is a two-stage heat pump that runs with the existing furnace as backup, called dual fuel.
How the template totals the options
Put 1 in the qty of the option the customer picks and leave the others blank. A blank qty shows the price with an empty amount, so the customer sees every option and the total counts only the one chosen. The shared installation lines always carry a qty.
The maintenance agreement as an add-on
List the maintenance agreement under optional add-ons with its own price. The sample prices two tune-ups a year at 1.5 hours each, which is $360 at the $120 rate. Carrier's tune-up page says a visit typically takes one to two hours.
Our HVAC service agreement template covers the plan terms and what published plans charge.
Walk the HVAC estimate template top to bottom
The workbook opens on the Estimate tab with sample values filled in. Blue cells on yellow are yours to edit, and black cells calculate.
Identity
Tamarack Ridge Heating & Air, a fictional Minneapolis shop, with a sample license number and the insurer. The fourth line says every tech on the job holds EPA 608 certification for refrigerant work.
Numbers and validity
A sequential estimate number, the date, a 30-day validity line and a proposed start. Thirty days is our judgment: HVACDirect showed a list and a sale price on every unit we read.
Customer and service address
Bill-to and service address side by side, with the square footage, the year built and where the furnace sits. Those facts drive the load and the labor.
Load, equipment schedule and site conditions
The HVAC block holds the load result, the existing system, one line per option with model numbers, the duct findings and the permit and incentive status.
Equipment options
One line per option, each priced as equipment plus coil divided by 0.55. Only Option 2 carries a qty.
Installation
Labor at 16 hours and $120, the line set, the kit and the permit, shared by every option.
Add-ons
The maintenance agreement at $360 a year, qty blank because the sample customer declined it.
Totals
Subtotal, a sales tax cell set to zero for your state's rule and the estimate total. The deposit is a payment term, so it lives in the terms and is not subtracted.
Terms, warranty and exclusions
One working day, a $1,000 deposit at signing and the balance on completion. Then the warranties and the exclusions: duct replacement, panel work, drywall and asbestos abatement are out unless added by change order.
Acceptance
Option picked, signature and date. The signed estimate becomes the contract.
Copy the sample lines without downloading:
| Description | Qty | Unit | Rate | Amount |
|---|---|---|---|---|
| Equipment options (pick one) | ||||
| Option 1, good: single-stage AC, 14.3 SEER2, matched coil | system | $6,003.64 | Not picked | |
| Option 2, better: two-stage AC, 17.2 SEER2, matched coil | 1 | system | $8,310.91 | $8,310.91 |
| Option 3, best: two-stage heat pump, dual fuel, matched coil | system | $10,449.09 | Not picked | |
| Installation (same for every option) | ||||
| Installation labor, crew of two, one day | 16 | hr | $120.00 | $1,920.00 |
| Line set, 30 ft, replaced and pressure tested | 1 | each | $692.73 | $692.73 |
| Condenser installation kit (MSK001) | 1 | kit | $399.82 | $399.82 |
| Minneapolis permit and inspection (fee $85.20, plus handling) | 1 | each | $154.91 | $154.91 |
| Optional add-ons (accept or decline) | ||||
| Maintenance agreement: two tune-ups a year | year | $360.00 | Not picked | |
| Subtotal | $11,478.37 | |||
| Sales tax, 0% | $0.00 | |||
| ESTIMATE TOTAL | $11,478.37 | |||
The plumbing estimate template uses the same layout. After the job, the HVAC invoice template carries these lines to billing.
Estimate, quote, bid or proposal
In practice the four words mean this:
- Estimate: your best price for the scope you saw, which can change if the scope does.
- Quote: a fixed price for a defined scope, held for a stated time.
- Bid: a price against someone else's plans and specs, as on new construction.
- Proposal: a quote laid out to sell, with options and photos.
The sample is an estimate in name and a quote in practice: a fixed price held 30 days.
Validity, deposits and change orders
State rules differ, so check the terms before you copy anyone's. Three government sources print these:
- Minnesota: the Attorney General's guide says a token good-faith down payment is customary but should not be more than a small percentage of the job.
- Minnesota: the same guide says state law requires contractors to put all contracts and change orders in writing, with the services, the materials and the price.
- California: the licensing board says a down payment should never exceed 10% of the contract price or $1,000, whichever is less. The contract must give the license number.
- Federal: the FTC Cooling-Off Rule gives a buyer until midnight of the third business day to cancel most sales of $25 or more made at their home.
The sample's $1,000 deposit is under 9% of $11,478, so it also clears California's cap. Minnesota's guide names the state Home Solicitation Sales Act for the three-day window, so a contract signed at the kitchen table needs the cancellation notice attached.
A change order is the written, priced addition to a signed estimate, agreed before the work. On a replacement it is often a duct repair found at the plenum.
Free estimates, paid diagnostics and trip fees
Write replacement estimates free and charge for the diagnostic visit on a repair. Housecall Pro's contractor data puts a residential diagnostic at $85 to $125. A trip fee is the same charge under another name, for coming out before any work is priced.
The free replacement estimate is a marketing cost, and searchers expect it. "Free hvac estimate" draws 880 Google searches a month at $52.94 a click, the top click price of the 14 searches in the tool below. When a repair visit turns into a replacement, credit the diagnostic and say so.
Homeowners price-check in March, so have the template ready
We pulled 12 months of Google search data on November 20, 2026 for the cost searches homeowners run before they call. Switch the tool below to the month view to see each search's year.
The 11 cost searches peaked at 104,100 in March and bottomed at 52,200 in September, a two times swing. We added Google's monthly counts for each search to get those totals.
Heat pump and furnace searches outnumbered air conditioning searches every month from October through April, and air conditioning led from May through September. Heat pump installation cost alone ran 40,500 searches in March and 3,600 in October.
Owners move with them. The three template searches, "hvac estimate template", "hvac quote template" and "hvac proposal template", summed to 640 in March against 250 in December. Build and price your template in the slow months, before the March rush.
Send it fast, then follow up
We found no published figure for how fast an estimate should go out. Our rule: before you leave the driveway, or the same day when the load calculation comes first. Follow-up has numbers behind it:
- The ACCA study, as Contracting Business reported it: top residential contractors close 55% to 60% of estimates, underperformers 22% to 30%.
- ServiceTitan's report: 47% of contractors with $10 million or more in revenue said following up on estimates brings in 11% to 15% of their income.
Put the follow-up on a calendar: a call the next day, a text halfway through the validity window and a last note before it expires. The search "hvac quote" costs advertisers $43.51 a click, so an estimate with no follow-up wastes what the call cost.
Building estimates in software
A spreadsheet works for a few estimates a week. Past that, software stores the price book and chases the signature. Two vendor pages show what to look for:
- Jobber's pricing page lists optional line items on its Grow and Plus plans, and automatic quote follow-ups by email or text from Connect up.
- Housecall Pro's help center says that by default a customer can approve only one option, and the rest are declined automatically.
Our HVAC estimating software comparison has every printed price and splits residential quoting tools from ductwork takeoff programs. Build the template first, so the software gets your sections and your divisor and not its defaults.
Is this estimate ready to send?
Score the estimate before it leaves the truck. The checks are the template's sections, weighted by our judgment of what costs the job or the margin when missing.
Mistakes that lose the job or the margin
- One line that says "install new AC." Nobody can compare it, and you cannot defend it when the scope grows.
- Adding overhead and profit to cost as a markup. On Option 2, adding 45% quotes $9,154 and loses $363 after overhead.
- Sizing from the old unit. Without a load calculation on the page, a bigger unit from the next shop looks as reasonable as yours.
- A tax credit line on a 2026 install. The IRS page ends the 25C credit with 2025 installs.
- No validity date. An estimate signed in May at November's equipment prices comes out of your profit.
- Skipping warranty registration. On the sample single-stage unit, unregistered parts coverage is 5 years against 10.
- No follow-up. Top contractors in the ACCA study close 55% to 60% of estimates, and the follow-up is the step fully in your hands.
When the estimates are right and the phone is quiet
A good estimate converts the homeowners you meet. It cannot put more of them in front of you, and the March search peak is when they look.
Skill Mammoth builds websites and runs marketing for contractors and home service businesses. Plans start at $350 a month, and a website build is $3,000 or $150 a month for 24 months. If estimates close and the calendar has gaps, that is where we help.
Get the HVAC estimate template. The Excel workbook and the PDF are free in the contractor templates pack, with a field guide tab that explains every line.
Want more estimate requests in March?
We build the website and run the marketing that fills an HVAC schedule. Plans start at $350 a month.
Frequently asked questions
What should an HVAC estimate include?
Twelve sections: your identity and license, the estimate number and validity date, the customer and service address, the load calculation, the existing system, an equipment schedule with model numbers and ratings, ductwork and line set findings, the permit and incentive status, each option priced as its own line, add-ons, terms with warranty and exclusions and a signature line.
How do you price an HVAC replacement estimate?
Add the labor hours times your cost of a billable hour to the equipment and materials at cost, then divide by one minus your overhead and profit shares. At 35% overhead and 10% profit the divisor is 0.55. Our sample 3-ton two-stage air conditioner replacement has $6,313 of direct cost and prices at $11,478.
What labor rate should go on an HVAC estimate?
At the BLS median wage of $29.33, a tech costs about $66 per billable hour once benefits, payroll taxes and unbilled time are counted. At 35% overhead and 10% profit, that hour sells for $120. Use your own payroll and billable share, because both move the rate more than the wage does.
How many options should an HVAC estimate have?
Three at minimum, four if your line-up allows. In the ACCA and Farmington Consulting Group study of more than 1,000 contractors, those offering four or more options closed 52% of jobs against 42% for one to three. Price each option as its own line so the customer picks one and the total counts only that one.
Can I still put the federal tax credit on an HVAC estimate?
Not for a 2026 install. The IRS page for the Energy Efficient Home Improvement Credit says it covers qualifying property placed in service from January 1, 2023 through 2025. Check your customer's utility rebates instead, print the amount with the date you read it and leave the federal credit line off the estimate.
How long should an HVAC estimate be valid?
The sample uses 30 days, which is our judgment, not a legal rule. Equipment list prices move, and a validity date lets you reprice an estimate that sat for months. Put the date on the estimate itself, and follow up before it expires: a call the next day and a text halfway through the window.
ChatGPT